ADOBE PREMIERE PRO: Tutorials Forum Articles Podcasts Basics Forum Creative Cloud Debate

sped up footage in CC

COW Forums : Adobe Premiere Pro

<< PREVIOUS   •   FAQ   •   VIEW ALL   •   PRINT   •   NEXT >>
beor ongsped up footage in CC
by on Feb 4, 2015 at 11:50:34 pm

So ive highlighted my footage, and sped all footage up by 10000%, but when i try and drag them into the timeline the clip size hasnt changed but the speed has been sped up. It results in the clip having its full size in the timeline with bars that indicate theres nothing there for the rest of the clip. If i resize it to less than what it should be then resize it back up it gets rid of the problem and it only resizes back to the size that the sped up clip should be. Problem is i have to deal with alot of clips so dragging them all in, then resizing each clip would be way to long.

Any ideas?

Return to posts index

<< PREVIOUS   •   VIEW ALL   •   PRINT   •   NEXT >>
© 2016 All Rights Reserved