AVID: Avid Editing Forum Avid Editing Tutorials

Re: Davinci to AVID to Davinci Issue

COW Forums : Avid Media Composer

VIEW ALL   •   ADD A NEW POST   •   PRINT
Respond to this post   •   Return to posts index   •   Read entire thread


James Jay
Re: Davinci to AVID to Davinci Issue
on Mar 16, 2017 at 9:25:37 am

Hi Shane, thanks for the reply! Yes the footage plays back slightly slower but we are filming ants so it's fine for us (audio is all replaced too so it doesn't matter if it sounds slowed)

We don't want to cut in 2997 and then just render it at 25 as that will yield dropped frames (I think?) But instead we want to conform before/at the stage of the edit, so that the 2997 footage plays back slightly slowed in a 25p timeline with no dropped frames. As I said, on PP this was easy as we had the program interpret the footage as 25p so it played slightly slower, but I need to find a workflow to do the same thing but with AVID.

I just can't think how its possible to cut/edit in 25 and still link back to the 2997 rushes without doing the method i described in my first post, as as you said in your reply "Proxies need to match the frame rate if you are to link back"

Any other imput from you or anyone else would be much appreciated. Thanks!


Posts IndexRead Thread 


Current Message Thread:





© 2019 CreativeCOW.net All Rights Reserved
[TOP]