Creative COW SIGN IN :: SPONSORS :: ADVERTISING :: ABOUT US :: CONTACT US
Creative COW's LinkedIn GroupCreative COW's Facebook PageCreative COW on TwitterCreative COW's Google+ PageCreative COW on YouTube
APPLE FINAL CUT PRO:HomeFCP ForumFCP XFCPX TechniquesFCP TutorialsFC ServerBasics ForumTrainingPodcastFAQ

Re: New Multicam Project Qs

COW Forums : Apple FCPX Techniques

VIEW ALL   •   ADD A NEW POST   •   PRINT
Share on Facebook
Respond to this post   •   Return to posts index   •   Read entire thread


Bret WilliamsRe: New Multicam Project Qs
by on Jul 6, 2012 at 10:06:44 pm

If I remember right, my method on the last project to find the spot on the multi clip (since the playhead doesn't follow) was to match frame, which of course does keep the playhead, then mark out and press cmd+d to get the duration, then double click on the multi clip.

My last project had one of the cameras was supposed to be kinda wandering or handheld look, but in the end I stabilized all those shots. Since they were part of a big multi clip, I had to do a lot of the above and then slice up just the portion to stabilize within the multi clip, or else it didn't stabilize very well since over the course of the clip the angle would change so drastically.

The stabilizer saved the show. Amazing. And fast when you just apply to the 10-20 sec you need. Much better than FCPs method of analyzing the entire file.

What is driving me nuts at the moment is that I set my monitoring channel to the WAV from the zoom. But in the bin and when I drag the clip to the TL (project) it defaults to something else and I have to right click and choose the WAV as the audio angle. Am I forgetting something?


Posts IndexRead Thread
Reply   Like  
Share on Facebook


Current Message Thread:




LOGIN TO REPLY



FORUMSTUTORIALSMAGAZINESTOCKYARDVIDEOSPODCASTSEVENTSSERVICESNEWSLETTERNEWSBLOGS

Creative COW LinkedIn Group Creative COW Facebook Page Creative COW on Twitter
© 2013 CreativeCOW.net All rights are reserved. - Privacy Policy

[Top]